Good start is half of success. The bottom is the first step in the renovation, which can effectively ensure the smooth construction of future construction. To a certain extent, it also avoids the phenomenon of “problem wrangling†caused by the quality of housing.
1, multi-communication
Before the start of construction, the owners, designers, project managers, and construction personnel must be present together to confirm the overall design and construction content of the house, communicate with each other well, and determine the specific time points and design content in order to ensure smooth construction in the future.
2, protect the entrance door
In order to prevent the entrance door from being damaged during the construction process, the decoration company should use a special door sleeve and protective film to wrap the door and handle tightly.
3, straight angle
Put professional measuring instruments on the corners of the wall and check whether the angles of the yin and yang are vertical from the numbers displayed on the tool to ensure accuracy.
4, confirm the project details
According to the design plan, the designer will detail the construction of the power and water, the water pipe arrangement, and the construction details of each room.
5, measuring wall empty drum
Many seemingly sturdy homes have a lot of hollows in their walls, even in heavy walls. Therefore, strict inspections must be carried out and repaired before construction.
6. Location of facilities
Each construction site has designated areas for assembly of tripods, stacking lightweight materials, hanging construction schedules, placing fire extinguishers, and so on, so that the site appears to be methodical and orderly.
7, confirm the pipeline layout
The construction staff repeatedly used a small hammer to strike the floor of each kitchen and bathroom, carefully inspected the laying quality of the floor and the pipe layout of the apartment itself, so as to avoid erroneous excavation in the future.
8, check the water up and down
Checking whether the floor drain is unobstructed is an important step in the acceptance of the house. If it is found that the flow is obstructed, it is necessary to contact the property in time to solve it. Otherwise, after the construction, it is difficult to judge which side the responsibility belongs to.
9, protect the water outlet
Sealing protection is provided for each tested sewage pipe nozzle at the site to prevent dust and rubbish from falling into the pipeline during future construction.
Villa design entrance decoration house decoration decoration design housing room apartment decoration
We can produce the Boiler Pipe accordng to the ASTM A335 and ASME SA335 standards, such as the P11 steel pipe, P12 steel pipe, P22 steel pipe, P91 steel pipe, P92 steel pipe, P5 steel pipe, P9 steel pipe and P36 steel pipe. Yangzhou Chengde have been sold about 700000 MT boiler pipe to the world in recent 10 years and we share the 70% of export boiler pipe in china.
In the year of 2015, we win the first prize of National Science and Technology Progress Award by the program of [The innovative research & development, and application of steel pipes used in 600 ℃ Ultra-super critical coal power generation unit".
YC has been granted a number of approval certificate by international institutions, such as ASME Nuclear pipe certificate, China Nuclear HAF certificate, 914mm Cylinder certificate, API monogram and certificate, ISO9001 by TUV NORD, ISO14001/OHSAS18001 by CQC, approvals from Shipping Classification Bureaus like DNV, RINA, ABS, Lloyd, GL, Bureau Veritas, and permit of exporting to Europe as PED 2014/68/EU and AD 2000 certificates for pressure pipes, CPD (Construction Products Directive), etc. and these certificates support the development of international sales market.
P11 Pipe,Astm A335 Pipe,P12 Pipe,P92 Pipe
YANGZHOU CHENGDE STEEL PIPE CO.,LTD , https://www.chengdepipe.com