1, grassroots cleanup
In order to ensure the quality of waterproof construction, our unit will carry out grassroots cleanup before the waterproof construction, requiring that the walls and the ground be level and empty. Within 20cm of the floor and wall facade, use a professional imported grinding machine and brush to level and clean it. As for the phenomenon of sanding on the floor of the newly installed kitchen and bathroom floor, we will re-do the cushions. The material is a mixture of cement paste, waterproof glue and plugging spirit. It has both leveling and waterproofing functions and is called rigid waterproof layer.
2, detail processing
The detailed treatment mainly includes: waterproof, weak parts such as pipe roots, floor drains, and corners. In the bathroom , some walls in the kitchen are not load-bearing walls, so cracks are easy. Especially in the new building, the foundation will sink in 1 to 2 years. There will be cracks of varying degrees in the building. I believe everyone has seen the cracks in the old building, so the decoration brush A layer of crack resistant cloth is added to the wall. Waterproof materials are also very important, and it is better to choose waterproof coatings with strong crack resistance. The practice of our company is to reinforce the carcass anti-creased cloth in the entire area within 20cm of the ground and the wall. For the problem of excessively high floor drain in residential buildings, our approach is as follows: use a professional machine to remove the ultra-high part of the floor drain and polish it, then clean the roots of the pipes, and plug the pipes with leaking water or water. The root is waterproofed.
3, waterproof coating construction
Waterproof material for Yuhong brand high elastic thick fat acrylic HCA-100
Add a small amount of water to dilute and mix well and start to paint the wall. After the wall is brushed, use a pair of scissors to cut the tear-resistant cloth to a width of 20 cm and start paving the wall covering (Figure 1). Note that wrinkles and hollowing are minimized when spreading.
3, After the vertical wall coverings are finished, start to spread the large cloth with a good measure. Be prepared to start spreading (Figure 2). First, apply a one-meter-wide waterproof coating on the bottom layer and place the cloth on the cloth with a little bit of pressure. Be careful to minimize wrinkles and emptying when spreading. All the pipes and floor drains took scissors to cut the cloth to a garden type and put the cloth flat. After brushing the cloth, brush the waterproof paint on the cloth a second time. Wait until the waterproof coating is dry. Proceed to the next process
4, the third time the construction, (waterproof paint stir well and start painting vertically. The pipe with the floor drain and heel brush waterproof paint to lay a layer of anti-cracking cloth (with paint and cloth in the heel of the tube a week that is Can) the heel of the pipe waterproof coating should be in 5 processes. Drying time should be 48 hours.Recommendation (should be spread in the bricks and tiles in the back door to do a waterproof and ground waterproof layer into one, with water leakage to In the living room, kitchen leaks %20 for this reason)
5. Plug all the water outlets well and use the rain cement or putty powder to stay in the water. Bring water to the water level 3 to 5 cm and check for leaks downstairs 24 hours a day.
6. The owner provides a strong and 1 bag of cement, and I do the wall plucking and floor protection for the owner to avoid joint responsibility with the decoration company.
20091204129671.jpg (8.76 KB)
10031021358e4afa645c5034c8.gif (152.08 KB)
1003102138b285cd11f9757537.gif (160.61 KB)
A_55828715.jpg (266.13 KB)
1253533575113_000[1].jpg (67.82 KB)
B_55828736.jpg (214.01 KB)
B_55828730.jpg (217.04 KB)
1253533583756_000[1].jpg (9.71 KB)
Entrance decoration Restaurant decoration Paint cement House decoration Find decoration company How do you decorate the living room bathroom Waterproof bathroom Waterproof material Overall bathroom Bathroom door Bathroom leak
Indoor decoration paint selection of what kind of decoration paint classification introduced
What material should be used for water pipes in hidden projects?
In order to ensure the quality of waterproof construction, the grassroots floor will be cleaned before the waterproof construction, and the walls and the ground shall be leveled without empty drums. Within 20cm of floor and wall facades, use professional machines and brushes for leveling and cleaning. For the phenomenon of sanding on the floor of the first kitchen and toilet room, the cushion will be re-made. The material is a mixture of cement paste, waterproof glue and plugging spirit. It is both leveling and waterproof and is called rigid waterproof layer. The following will be every detail step in the construction process of kitchen and toilet waterproof coating, hoping to help everyone.
Bathroom waterproof effect is the key to bathroom renovation. Bathroom decoration should not only pay attention to the general beautification effect, but also must have quality waterproof effect. To do a good job of bathroom waterproofing can reduce a lot of unnecessary troubles and make life more convenient and comfortable. Here's a look at the home improvement bathroom with a small series of waterproof practices and bathroom waterproof how to do it for your reference.
Home kitchen toilets These places are the most vulnerable to wet, so many people in these places to carry out key waterproofing works, but people who do not know about this would ask: Why do kitchen toilets have to be waterproof? What are the steps for kitchen toilets to be waterproof? What about? In order to ensure the construction quality of waterproofing, the grassroots level must be cleaned before the waterproof construction. The wall and the ground are required to be flat and empty. Within 20cm of floor and wall facades, use professional machines and brushes for leveling and cleaning. It is normal for the first time to decorate the kitchen and bathroom floor with sanding phenomenon. It is necessary to re-do the cushion, and the mixture of cement and waterproof glue for the material and plugging the spirit, and the role of leveling and waterproofing. It is called a rigid waterproof layer. Here are the steps for everyone to provide waterproof toilet kitchen, for your reference!
Kitchens and toilets are the areas with the most water in the living room. If there is often water on the ground, the water is likely to leak into the wall through the gaps in the wall. Once the floor drain leaks, the drainage pipe is blocked and the water in the ground is easily penetrated through the cement. Layer leaks downwards. Therefore, it is very important for the kitchen and bathroom to be waterproof. So how to do waterproof kitchen and bathroom? Follow the small series together to understand it.
Toilet water is frequent, and if it is not treated properly, water will leak. The main phenomena are leakage of floor drains, water in the ground area, dampness in the walls, seepage of water, and even wet dripping in the underlying roof and walls. To manage the leakage of the bathroom, you must first find out the location and cause of the leakage. Next, Xiao Bian gave you talk about why the bathroom leaked and the toilet was leak-proof and waterproof.
submit
Intelligent Control Butterfly Valve
Zhejiang Heshuo Technology Co., Ltd , https://www.hosuocn.com